Bathroom remodeling
Kitchen remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterWhat a Bathroom Remodel Really Costs in Miami Gardens, FL
Most bathroom remodels in Miami Gardens run $10,620 to $33,040 for the work above the floor, and the honest number depends on what’s behind your tile, not on what’s on it. In this city’s 1960s to 1980s CBS homes, original single-layer drywall, green board, corroded drain lines and porous block that wicks moisture regularly turn a “simple” refresh into a substrate-and-plumbing job. Call (844) 797-8316 for a free written estimate with the contingency spelled out, so your budget is a real budget and not a floor.
The Tile Isn’t the Expensive Part. The Wall Behind It Is.
Here’s what we see when we open a wall in a Miami Gardens bathroom that’s been tiled since the Reagan administration. The thinset on the surface looks fine. Six inches in, the substrate has failed. Green board that was rated for dry areas has been soaking up steam since before anyone in the house owned a smartphone. CBS block behind it stays damp and wicks moisture inward long after a shower drains. Sometimes there’s active mold in the cavity, and you don’t find that on demo day if the demo hasn’t happened yet.
That’s the reason a bathroom remodel here can’t be priced like a bathroom remodel in a dry climate. Miami Gardens sits in a hot, humid subtropical zone, so moisture management isn’t a nice extra. It’s the load-bearing part of the estimate. Any contractor who quotes you off a phone description, without opening an access panel or looking at the substrate, is quoting the ceiling of a guess. We don’t know a single honest remodeler who can do better than that sight unseen, and we won’t pretend to.
How Much Does a Bathroom Remodel Cost in Miami Gardens?
Three tiers cover nearly every job we’re called to, and the range is wide on purpose. The contingency for substrate, mold or plumbing is what separates the bottom from the top:
| Scope | Typical Miami Gardens Range |
|---|---|
| Basic cosmetic remodel (tile, vanity, fixtures, paint, no layout change) | $8,000-$14,000 |
| Mid-range with shower rebuild and fixture upgrades | $16,000-$28,000 |
| Full gut with waterproofing system and mold remediation | $28,000-$45,000 |
| Small bathroom remodel (secondary bath, tight footprint) | $5,900-$14,160 |
| Walk-in shower installation | $5,310-$14,160 |
| Tub-to-shower conversion | $4,130-$11,800 |
| Bathroom vanity installation | $945-$3,540 |
The remediation line isn’t an upsell. It’s climate-driven. In a Miami Gardens bathroom, a body of water hits the wall several times a day, every day, in a house built with block that holds moisture. Skip the remediation and the new tile is sitting on the same wet wall the old tile was sitting on. It will fail again, and usually faster.
The Waterproofing Standard, In Plain Terms
A continuous waterproofing membrane behind the tile in a shower enclosure is not optional here. In a humid subtropical climate where CBS block wicks moisture from the ground and the air, the membrane is the line between a bathroom that lasts and one that rots the second time. The systems we install are the ones with published spec sheets and certified installation requirements: Schluter Kerdi or a liquid-applied system like RedGard, applied to the manufacturer’s standard, tied in at the curb, the walls, and the drain.
- Continuous coverage, not spot-applied. The membrane runs behind every square inch of tile in the wet zone, up onto the curb and past the shower head.
- Vapor-tight assembly. Block gets a vapor barrier and the membrane caps the assembly, so moisture is managed where it belongs.
- Certified installers, spec-matched materials. We install to the manufacturer’s written method, which keeps the system’s warranty intact.
- Inspection-friendly. Every eligible job gets a permit pulled and a signed inspection, so the waterproofing happens under a city inspector’s eye, not just ours.
For a deeper walkthrough of the trades we touch, see our Bathroom Remodeling page. This piece is about the number. That page is about the sequence.
What Usually Gets Found Once the Wall Comes Down
On 1960s to 1980s CBS homes, the drain lines are often the second surprise. Original cast-iron drains and galvanized supply lines corrode from the inside out, usually right where they meet the slab, and no amount of testing from above catches a crack that’s still holding together on the day you look. When that line is exposed during a tub-to-shower conversion, it’s repaired or partially rerouted before the new assembly goes in. It’s a real cost and a real scope change, and it always arrives in writing at Barrett & Sons before a single pipe moves.
The same rule holds for the exhaust fan. A bathroom remodel that adds or reroutes a fan circuit needs a permit from Miami Gardens’ own building department, and it’s not the same process as pulling a permit through Miami-Dade County. This city runs its own department, and after Hurricane Andrew, code enforcement here is real. The permit isn’t a formality. The inspector works for you, not us, and that’s a good thing.
Why a Written Budget Is the Only Budget That Survives Demo Day
The reason homeowners get burned on bathroom remodels isn’t that they picked the wrong tile. It’s that the tile was priced in writing and the substrate wasn’t. Every scope item, every allowance, and every price change at Barrett & Sons arrives as a written change order before work happens. The allowance that isn’t on paper is a surprise waiting for a date, and a bathroom with a 1970s substrate is exactly where those surprises show up.
We’re owner-operated, and the account above is the one Tom’s crew runs on. Our crew members have up to 28 years of experience, are background-checked, and carry the name on their shirts. Every completed job is backed by the written 90-Day Done Right Promise: if it isn’t right, one call brings us back to make it right. A live person answers the phone around the clock, not a voicemail box or an out-of-state call center. We pull permits on every eligible job. And we’re not a franchise sending strangers. Look up the license number before you sign anything. We publish it for exactly that reason.
Budgeting the Tile, the Fixtures and the Rest
When you build the number, keep the trade-offs in front of you. Premium materials are worth the line item, but only after the substrate and the plumbing are settled. We install brands you can look up, like Cambridge Pavers and Techo-Bloc on the exterior hardscape side of the project, and we’d rather spend your budget on what the inspector can’t see than on a showroom finish the next water leak will ruin. For the full range of related work in a Miami Gardens home, start at our home page and work outward.
FAQs
A bathroom remodel in Miami Gardens typically costs $10,620 to $33,040, with the spread driven almost entirely by substrate and plumbing condition rather than tile selection. A basic cosmetic refresh lands around $8,000 to $14,000, a mid-range with shower rebuild runs $16,000 to $28,000, and a full gut with waterproofing and mold remediation sits at $28,000 to $45,000. Call (844) 797-8316 for an exact quote – estimates are free and we’ll open the wall before we put a number on paper.
No, and any contractor who tells you a full bathroom remodel finishes same-day isn’t being straight with you. A cosmetic remodel takes days, a mid-range with a shower rebuild takes a couple of weeks, and a full gut with remediation runs longer. What we can do the same day is answer the phone, book a free second opinion on any written estimate you already have, and tell you what we’d expect to find behind your tile. That call is free at (844) 797-8316.
Repair is almost always cheaper up front, and in Miami Gardens it’s usually the wrong call once the substrate is compromised. If the waterproofing or the wall behind the tile has failed, a patch job buys you six months to a year before the same water finds the new tile. A full shower rebuild with a proper membrane costs more today and costs less across the next decade. Call (844) 797-8316 and we’ll tell you which side your shower falls on after we look at it.
Yes, if the job moves plumbing, adds or reroutes an exhaust fan circuit, or changes the layout, you need a permit from Miami Gardens’ own building department. Cosmetic work alone – new tile over an intact substrate, a vanity swap, paint – often doesn’t. The city runs its own department separate from Miami-Dade County, and getting the permit pulled is on us, on every eligible job. Call (844) 797-8316 and we’ll walk you through exactly what your job triggers.
Get a Written Estimate Before You Spend a Dollar
If you’re ready to know what your bathroom actually costs, call (844) 797-8316 for a free estimate. We’ll open the access panel, look at the substrate, and build a written budget with the contingency in it. Free second opinion on any estimate you already have, no trip charge inside the county, and a 10% senior and veteran discount that’s permanent. Take the call before you sign anything from anyone.
Written by the team at Barrett & Sons Construction Miami Gardens, serving Miami Gardens, FL.
What Our Customers Say
"He pulled every permit and had every inspection signed off. The last contractor we used told us permits were optional and I have been paying for that ever since."
- Redmond Cavanaugh"His sons run the crews and they were in our house for four months. Not once did I feel I had to be home to keep an eye on things."
- Camila Fuentes"Came back a year later to sort a door that had dropped as the frame settled. No charge and no argument about whether it was covered."
- Thaddeus Oyelowo