Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
CGI Home Additions & ADU: The Miami Gardens Owner’s Guide
If you have a CGI home addition or ADU shell that’s failing – sagging headers, water coming through the tie-in, doors that won’t close square – we replace and rebuild the affected assembly with CGI-compatible components. Installed pricing in Miami Gardens for a full addition runs $53,100 – $153,400, and stand-alone ADU construction runs $106,200 – $259,600. We’re an independent contractor and not affiliated with CGI. A failed addition shows up in documents first: the permit file, the inspection record, the homeowner’s insurance rider. Owners usually learn something is wrong when a buyer’s inspector flags an unpermitted tie-in, or when the ceiling drywall in the new room starts to crack along a seam that shouldn’t move.
Which CGI Models This Applies To
CGI isn’t a single product line. The brand covers modular and panelized addition shells, enclosed patio conversions, and accessory dwelling units built to a range of footprints – and the “model” you own is usually identified by a data plate on the structural frame or a stamped panel tag inside the attic cavity, not by a number on your closing paperwork. Find the plate before you call anyone. Photograph the tag, measure the interior footprint wall-to-wall, and note the roof pitch. Those three facts decide which replacement panels, tie-in flashings, and header assemblies fit your structure.
Here’s the compatibility gotcha that costs Miami Gardens owners real money: CGI shells built before roughly 2002 often used panel modules sized to a different stud spacing than current stock. A modern replacement panel will physically fit but won’t carry the same load path unless the header and connector package is upgraded to match. An OEM match on a legacy CGI panel is possible but slow, and a quality aftermarket equivalent from a Florida supplier is usually the smarter buy when the engineer signs off on it. We make that call with the spec sheet in hand, not from memory. We also install KraftMaid, Cambria, and Silestone finishes if the interior fit-out is part of the rebuild.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your CGI Home Additions & ADU Is Failing
These are the failure patterns we see most often when we open up a CGI structure in Miami Gardens. Each one has a cause worth understanding before you authorize any work.
- Cracks along the ceiling seam where the addition meets the original house. This usually means the tie-in connection has loosened or the foundation under the new footprint has settled differently than the main structure. Repainting the crack hides it for a season; the movement returns.
- Water staining or soft drywall near the roof-to-wall junction. CGI shells use specific flashing profiles at the tie-in, and when those are installed without proper step flashing or are sealed with caulk instead of metal, Miami Gardens’ summer rain finds the gap. The stain on the ceiling is the last thing to appear, not the first.
- Doors and windows that stick or won’t latch square. In an addition, this is rarely the door. It’s the frame racking because the header above it is undersized or the panel connections have shifted. Adjusting the hinges won’t fix a structural problem.
- Musty smell or rising humidity in the new room. CGI additions need a continuous vapor barrier and correctly mated wall panels. A gap in the barrier lets Florida ground moisture wick into the cavity, and the smell arrives before the visible damage does.
- Visible sag in the roofline over the addition. This points to a failing header, a compromised truss connection, or a panel that was never rated for the span it’s carrying. It’s the most serious symptom on this list and the one that shouldn’t wait.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
Pricing for CGI-compatible addition work in Miami Gardens depends on three things: the size of the footprint, whether the existing foundation and tie-in can be reused, and how much of the interior finish-out is in scope. Here’s how the numbers break down.
| Scope | Installed Range (Miami Gardens) |
|---|---|
| Full home addition (CGI-compatible shell + finish-out) | $53,100 – $153,400 |
| Stand-alone ADU construction | $106,200 – $259,600 |
| Garage conversion to living space | $35,400 – $94,400 |
That range covers permits pulled and inspections signed, the structural panel and tie-in work, and the finish-out allowance spelled out on paper before we start. A failed tie-in repair that reuses the existing shell sits at the low end. A full rebuild with new foundation bearing, upgraded headers, and a complete interior sits at the high end. Every price change is a written change order issued before the work happens – the allowance that isn’t on paper is a surprise waiting for a date. Every completed job carries our written 90-Day Done Right Promise.
DIY or Call Us?
Some things you can safely check yourself. Walk the perimeter of the addition and photograph any crack wider than a credit card. Note where doors stick and whether it’s seasonal or constant. Look in the attic cavity for water staining on the panel faces. Those observations help us quote accurately and they cost you nothing.
What you shouldn’t do is open up a load-bearing tie-in, cut into a header, or attempt to re-flash a roof-to-wall junction on your own. An undersized or improperly connected header in an addition is a collapse risk, and a bad flashing job you can’t see will cost more to fix than the original repair. This is structural work. It belongs with someone who’ll pull the permit and stand behind the inspection. Call us at (844) 797-8316 and we’ll walk the structure with you.
FAQs
A properly built CGI shell with correct flashing and a continuous vapor barrier should hold up for decades in South Florida’s climate, but the tie-in and roof junction are the weak points and need inspection every few years. Heat, humidity, and hurricane-season rain stress those connections faster here than in drier markets. Call (844) 797-8316 for a free estimate on any repair or rebuild.
Often yes. A loosened tie-in flashing, a settled pier, or a single compromised panel can frequently be repaired without rebuilding the whole structure, and we’ll tell you honestly which side of that line your job falls on. The determining factor is whether the load path is still sound. Call (844) 797-8316 and we’ll assess it in person.
A targeted tie-in or flashing repair typically runs a few days, while a full addition rebuild or ADU build runs weeks to months depending on permits and finish-out scope. Miami Gardens permit timelines factor into that schedule, and we give you a written timeline before work starts. Call (844) 797-8316 for a free estimate with a realistic schedule.
We start with the data plate on your structure to identify the model and panel spec, then source either an OEM match or a quality aftermarket equivalent that meets the same load rating, and we bring you the spec sheet before ordering. You’ll see exactly what’s going in and why. Call (844) 797-8316 to schedule your free estimate.
If your CGI addition or ADU is showing any of these signs, don’t wait for the next storm to make the decision for you. Call Barrett & Sons Construction Miami Gardens at (844) 797-8316 to schedule your free estimate. Tom Barrett publishes his name, address, and license number – look it up before you sign anything. A live person answers the phone around the clock, and we’ll give you no-hassle upfront pricing with every scope change in writing before a single nail moves.
Written by the team at Barrett & Sons Construction Miami Gardens, serving Miami Gardens and nearby areas.