A Barrett company - serving Miami Gardens, FL

CGI Home Additions & ADU in Miami Gardens, FL

Home additions & ADUHome additions & ADU
Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

CGI Home Additions & ADU: The Miami Gardens Owner’s Guide

If you have a CGI home addition or ADU shell that’s failing – sagging headers, water coming through the tie-in, doors that won’t close square – we replace and rebuild the affected assembly with CGI-compatible components. Installed pricing in Miami Gardens for a full addition runs $53,100 – $153,400, and stand-alone ADU construction runs $106,200 – $259,600. We’re an independent contractor and not affiliated with CGI. A failed addition shows up in documents first: the permit file, the inspection record, the homeowner’s insurance rider. Owners usually learn something is wrong when a buyer’s inspector flags an unpermitted tie-in, or when the ceiling drywall in the new room starts to crack along a seam that shouldn’t move.

Call (844) 797-8316

Which CGI Models This Applies To

CGI isn’t a single product line. The brand covers modular and panelized addition shells, enclosed patio conversions, and accessory dwelling units built to a range of footprints – and the “model” you own is usually identified by a data plate on the structural frame or a stamped panel tag inside the attic cavity, not by a number on your closing paperwork. Find the plate before you call anyone. Photograph the tag, measure the interior footprint wall-to-wall, and note the roof pitch. Those three facts decide which replacement panels, tie-in flashings, and header assemblies fit your structure.

Here’s the compatibility gotcha that costs Miami Gardens owners real money: CGI shells built before roughly 2002 often used panel modules sized to a different stud spacing than current stock. A modern replacement panel will physically fit but won’t carry the same load path unless the header and connector package is upgraded to match. An OEM match on a legacy CGI panel is possible but slow, and a quality aftermarket equivalent from a Florida supplier is usually the smarter buy when the engineer signs off on it. We make that call with the spec sheet in hand, not from memory. We also install KraftMaid, Cambria, and Silestone finishes if the interior fit-out is part of the rebuild.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Signs Your CGI Home Additions & ADU Is Failing

These are the failure patterns we see most often when we open up a CGI structure in Miami Gardens. Each one has a cause worth understanding before you authorize any work.

  • Cracks along the ceiling seam where the addition meets the original house. This usually means the tie-in connection has loosened or the foundation under the new footprint has settled differently than the main structure. Repainting the crack hides it for a season; the movement returns.
  • Water staining or soft drywall near the roof-to-wall junction. CGI shells use specific flashing profiles at the tie-in, and when those are installed without proper step flashing or are sealed with caulk instead of metal, Miami Gardens’ summer rain finds the gap. The stain on the ceiling is the last thing to appear, not the first.
  • Doors and windows that stick or won’t latch square. In an addition, this is rarely the door. It’s the frame racking because the header above it is undersized or the panel connections have shifted. Adjusting the hinges won’t fix a structural problem.
  • Musty smell or rising humidity in the new room. CGI additions need a continuous vapor barrier and correctly mated wall panels. A gap in the barrier lets Florida ground moisture wick into the cavity, and the smell arrives before the visible damage does.
  • Visible sag in the roofline over the addition. This points to a failing header, a compromised truss connection, or a panel that was never rated for the span it’s carrying. It’s the most serious symptom on this list and the one that shouldn’t wait.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Replacement Cost & What’s Included

Pricing for CGI-compatible addition work in Miami Gardens depends on three things: the size of the footprint, whether the existing foundation and tie-in can be reused, and how much of the interior finish-out is in scope. Here’s how the numbers break down.

Scope Installed Range (Miami Gardens)
Full home addition (CGI-compatible shell + finish-out) $53,100 – $153,400
Stand-alone ADU construction $106,200 – $259,600
Garage conversion to living space $35,400 – $94,400

That range covers permits pulled and inspections signed, the structural panel and tie-in work, and the finish-out allowance spelled out on paper before we start. A failed tie-in repair that reuses the existing shell sits at the low end. A full rebuild with new foundation bearing, upgraded headers, and a complete interior sits at the high end. Every price change is a written change order issued before the work happens – the allowance that isn’t on paper is a surprise waiting for a date. Every completed job carries our written 90-Day Done Right Promise.

DIY or Call Us?

Some things you can safely check yourself. Walk the perimeter of the addition and photograph any crack wider than a credit card. Note where doors stick and whether it’s seasonal or constant. Look in the attic cavity for water staining on the panel faces. Those observations help us quote accurately and they cost you nothing.

What you shouldn’t do is open up a load-bearing tie-in, cut into a header, or attempt to re-flash a roof-to-wall junction on your own. An undersized or improperly connected header in an addition is a collapse risk, and a bad flashing job you can’t see will cost more to fix than the original repair. This is structural work. It belongs with someone who’ll pull the permit and stand behind the inspection. Call us at (844) 797-8316 and we’ll walk the structure with you.

FAQs

Need Construction help nationwide? Licensed & insured · free written estimates
Call (844) 797-8316
Local Service Coverage

Request a Free Estimate in Miami Gardens

Tell us what you need - Barrett & Sons Construction Miami Gardens responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch