Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Delta Home Additions & ADU: The Miami Gardens Owner’s Guide
We build and install Delta home additions and ADU projects in Miami Gardens, and a typical addition runs $53,100 to $153,400 installed, while a full ADU lands between $106,200 and $259,600. These are planned builds, so we schedule them rather than promise same-day work. Most Miami Gardens owners discover a failing addition the same way: a hairline crack that reappears after every rain, a door that won’t latch come April, or a bedroom that stays ten degrees warmer than the rest of the house no matter what the thermostat says.
Which Delta Models This Applies To
Delta’s residential addition and ADU lines show up across Florida in a few common configurations: single-story primary suites, two-room in-law additions, and detached or attached ADU units. The tag on the original permit set or the sealed plans in your county file tells you which series you have. Pull the plan set before you buy anything. Half the ordering mistakes we see in Miami Gardens come from a homeowner matching a part to the wrong series because the label was sun-bleached and unreadable.
OEM parts carry a cost premium but guarantee the spec. Quality aftermarket equivalents for Delta units are legitimate when they carry the same dimensions and load rating. The gotcha: Delta’s modular panel channels changed dimension slightly between production runs, and a part that fits a 2015 unit may not seat on a 2019 one. Measure your existing channel, don’t trust the catalog year. We also install KraftMaid, Cambria, and Silestone finishes when an addition includes a kitchen or bath.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Delta Home Additions & ADU Is Failing
- Cracks that return after patching. Hairlines along interior corners usually mean foundation settlement or a flashing gap letting Miami Gardens rain in. Patch the crack and it comes back because the water source never got fixed.
- Doors and windows that stick seasonally. Wood framing swells with South Florida humidity. A door that binds only in summer points to moisture intrusion, not a bad hinge.
- Musty smell after heavy rain. That’s trapped moisture behind drywall or under flooring. In Miami Gardens it often traces to a roof-to-wall transition that was never flashed correctly.
- Soft or spongy floor near exterior walls. Subfloor rot from a slow leak. By the time you feel it, the damage has usually been growing for a year or more.
- Uneven cooling in the addition. Undersized ducting or missing insulation in the new walls. The unit isn’t failing, the envelope is.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
For a Miami Gardens addition or ADU repair or partial rebuild, here’s what the numbers look like:
- Home addition (full): $53,100 – $153,400
- ADU construction: $106,200 – $259,600
- Garage conversion: $35,400 – $94,400
What drives the range: foundation work, roof tie-in, window and door grade, and whether the permit draws plan review. We quote parts and labor line by line, so you see what the panel costs versus the install. Every price change comes as a written change order before work moves. Every eligible job gets permits pulled and inspections signed, and every finished job carries our written 90-Day Done Right Promise. Our crews bring up to 28 years of experience to each build.
DIY or Call Us?
You can safely check a few things yourself: look for daylight at door frames, press a screwdriver into suspect floor near exterior walls, and check the permit history on your county’s online portal. Where DIY goes wrong on an addition is structural. Moving a load-bearing wall, re-flashing a roof tie-in, or cutting into a foundation to chase a crack can turn a $2,000 repair into a five-figure rebuild. One honest note: cracks that reappear after patching are almost never a cosmetic problem, and a homeowner who treats them that way loses money. Call us at (844) 797-8316 and we’ll tell you what’s actually failing before you spend a dime on parts.
FAQs
A well-built addition should hold 30 to 50 years, but in Miami Gardens the roof tie-in and flashing are what decide that. UV exposure and hurricane-season rain punish the transitions first. Keep those sealed and the structure outlasts the roof by decades.
Often yes. Foundation cracks, flashing failures, and subfloor rot are repairable when caught early. Structural movement that has gone on for years sometimes needs a partial rebuild. We give you the honest read either way, in writing.
A targeted repair runs days to a couple of weeks. A full addition or ADU runs months, and the permit timeline in Miami-Dade is the biggest variable. We map the schedule before we start so you know what to expect.
We match the part to your plan set and model series, then source it through manufacturer channels or a verified aftermarket equivalent. We tell you the source before you approve it. We don’t stock parts and we don’t carry them on a truck, so everything is ordered to your spec.
Barrett & Sons Construction is an independent builder and is not affiliated with Delta. Call (844) 797-8316 for a free estimate, and we’ll bring a written second opinion on any estimate you already have.
Written by the team at Barrett & Sons Construction Miami Gardens, serving Miami Gardens and nearby areas.