Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Schluter Home Additions & ADU: The Miami Gardens Owner’s Guide
We install Schluter-compatible home additions and ADUs in Miami Gardens, and a typical project here runs $53,100 – $153,400 for an addition, with ADU construction in the $106,200 – $259,600 range. This page is for the owner who already has a Schluter system specified or installed and is trying to figure out what failed at the wall, the slab edge, or the door opening. Scheduling a free estimate is the fastest way to get an exact number, but additions are planned work – we don’t pretend a 700-square-foot build happens in a day, and neither should anyone else. Most Miami Gardens owners first notice trouble as a hairline crack tracking down the interior wall where the addition ties into the original block, or as grout lines over a patio threshold that keep opening up every wet season.
Which Schluter Models This Applies To
Schluter is a tile and substrate systems brand, and its role in an addition shows up in a few specific places: DITRA and DITRA-HEAT uncoupling membranes under floor tile, KERDI and KERDI-BOARD in new bathroom walls and shower pans, SCHIENE and DILEX profiles at floor transitions, and the KERDI-LINE linear drain in a new shower. If your addition includes a bathroom or a tiled lanai, one or more of these is likely the part in question. To identify what you have, read the printed edge of the membrane roll or the profile strip, check the drain flange for the model stamp, and measure the tile thickness the profile was cut for – SCHIENE and DILEX are sized to the tile, and using a profile meant for 5/16 inch tile on a 3/8 inch tile leaves a lip you’ll feel barefoot for years. OEM Schluter and a quality aftermarket uncoupling membrane are not the same product: the fleece weight, the grid pattern, and the shear bond behave differently, and mixing brands across one bonded assembly is where failures start. We’re an independent contractor, not affiliated with Schluter, and we’ll tell you straight when the generic roll is fine and when it isn’t.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Schluter Home Additions & ADU Is Failing
- Hollow-sounding tile across a room, not just one tile. A dull thud underfoot across several square feet usually means the uncoupling membrane lost its bond to the slab, not that one tile came loose. In Miami Gardens, that often traces to a slab that was still sweating when the thinset went down.
- Grout cracking in a straight line over a control joint or between old and new construction. The membrane is doing its job at the tile face but the joint beneath it moved more than the assembly allowed. This is the classic addition-to-existing-house tell.
- Water darkening the thinset at a shower curb or door threshold. KERDI that was lapped the wrong direction or cut short at a corner wicks water sideways. You see it as a damp band, not a puddle.
- A profile strip lifting or rocking at a floor change. Usually an install that skipped the recommended setting material under the profile’s anchoring leg, common on lanai-to-interior transitions that see sun and rain cycling all summer.
- Soft or drummy spots only near exterior walls and doors. That’s moisture finding its way in at a flashing or threshold detail and softening the substrate under the tile, and it gets worse every rainy season until it’s addressed.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
For Miami Gardens, plan on the following installed ranges. These are the same numbers we quote across the site, so nothing shifts between pages.
| Scope | Installed range (Miami Gardens) |
|---|---|
| Home addition (full scope) | $53,100 – $153,400 |
| ADU construction | $106,200 – $259,600 |
| Garage conversion | $35,400 – $94,400 |
| Walk-in shower installation | $5,310 – $14,160 |
| Tub-to-shower conversion | $4,130 – $11,800 |
| Bathroom remodel | $10,620 – $33,040 |
What drives the range: footprint and block work, whether the addition carries a bathroom, roof tie-in complexity, impact-rated glazing, and how much of the floor gets tiled over a Schluter assembly. Parts and labor are quoted as separate lines, not bundled into a mystery number. Every price change on a Barrett & Sons job arrives as a written change order before the work moves, and the finished job carries our written 90-Day Done Right Promise. Permits get pulled and inspections signed on every eligible addition in Miami Gardens.
DIY or Call Us?
You can safely check a few things yourself: press a tile with a coin to listen for hollow spots, look for a paper tag or printed edge on the membrane, and note where cracks run relative to door openings and exterior walls. What you shouldn’t do is tear up a bonded tile assembly to “see what’s under it” – the failure you expose won’t tell you much, and you’ll be patching a waterproofed detail with no way to verify the lap. Waterproofing under a shower or wet-area floor is where DIY goes wrong most often, because the mistake is invisible until the second year. If you’re weighing repair against replacement, call (844) 797-8316 and we’ll look at it before you spend anything. Estimates are free and there’s no trip charge inside the county.
FAQs
A properly installed Schluter assembly routinely lasts the life of the tile above it, often 25 years or more. What shortens that in Miami Gardens is installation error rather than the part: thinset that skimmed over before the membrane went down, or a slab that wasn’t dry. Call (844) 797-8316 for an exact assessment before you assume the floor has to come out.
Sometimes yes, and it depends on where the failure sits. A single lifted profile or a shower that leaks at one corner can often be fixed by redoing that detail, while widespread hollow tile over a lost bond means the floor comes up. We quote both options in writing so you can compare them side by side.
A one-day job for a profile or a single shower detail; three to five days for a bathroom assembly tear-out and rebuild; and a full addition runs weeks to months depending on footprint and permitting. Nobody installs a home addition in a single visit, and any contractor who says otherwise in Miami Gardens is telling you something.
We specify the model and size from the manufacturer’s current catalog and order against your actual tile thickness and drain model, not a generic guess. Because each addition is planned rather than an emergency, materials arrive before tear-out starts, so we’re not improvising a substitute on your floor.
We also work alongside KraftMaid, Cambria, and Silestone on the interiors side when an addition brings a new kitchen or bath into the plan.
Ready to price it? Call (844) 797-8316 for a free estimate. Barrett & Sons Construction Miami Gardens answers with a live person, day or night, and we’ll put the scope, the allowance, and any price change in writing before a nail moves. Ask about the free second opinion on any written estimate you already have, and the permanent 10% Senior & Veteran discount.
Written by the team at Barrett & Sons Construction Miami Gardens, serving Miami Gardens and nearby areas.