Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Country Club
Country Club runs on built-out lots, which changes everything about an addition. You’re not building on open acreage. You’re adding onto a 1960s or ’70s concrete-block home off the Palmetto corridor, and every square foot has to fit the site plan you already have. We know that ground, and we know the county desk that reviews it. Call (844) 797-8316 and we’ll walk your lot with you before you spend a dollar on drawings.
Why Barrett & Sons Construction Miami Gardens Is Country Club’s Preferred Home Additions & ADU Company
Barrett & Sons was founded in 1998 and has stayed owner-operated from day one. That matters in Country Club because the person who quotes your addition is the person whose name is on the truck, and whose license number you can look up yourself before you sign anything. We’ve built a strong local reputation across ZIP 33015 by doing the unglamorous part right: permits pulled, allowances written down, and every price change on paper before a nail moves.
Country Club homeowners have usually been burned once already. A national outfit quotes one number on the phone, then hands over a different bill at the door. Our 90-Day Done Right Promise is written on every contract: if it’s not done right, one call brings us back to make it right. We answer the phone with a live person, 24 hours a day, seven days a week, and we know the difference between a villa cluster and a single-family lot on the west side of the corridor.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Home Additions & ADU Services in Country Club
Country Club additions and ADUs run through Miami-Dade County’s building department, not a municipal one, and because your lot is already platted and built on, the county reviews setbacks, impervious-lot coverage and utility tie-ins against your existing site plan. That’s the reality every job here starts from. Here’s how we scope it. For the full service detail, see our Home Additions & ADU hub.
ADU Design & Permitting
Every new roof, window and glazing unit in an ADU here needs a documented Miami-Dade Notice of Acceptance under the post-Andrew code, not a like-for-like swap. We bring the NOA paperwork to the county review and build the permitting timeline into your scope, so product approvals don’t get flagged at inspection after the handshake.

Garage Conversion ADU
A Country Club garage conversion is often the cheapest path to a rentable unit, and it’s usually where the surprises hide. Many of these homes have original carports or slab garages with tie-ins that need to be rechecked against the existing drain and utility map before framing begins.

New Detached ADU
A detached ADU on a Country Club lot starts with site prep, not the building. Grading, drainage and the utility trench have to resolve against your platted lot, and on the older villa and townhome clusters you’ll often find a flat roof or poorly flashed wall trapping moisture. We resolve the site before we quote the structure.

Junior ADU & Interior Conversion
An interior conversion or room addition in a ’60s-’80s block home frequently begins with cosmetic cracks that turn out to be poorly flashed stucco holding summer rain, with soft framing behind it. That has to be opened and dried before any rough-in starts.
Trusted Brands We Service in Country Club
Concrete and masonry work on a Country Club addition leans on materials you can look up yourself: Quikrete and Sakrete for repair and pour work, Oldcastle for block and hardscape base. We don’t claim to stock parts locally, and we don’t need to. What we do is specify named brands, put them in the written scope, and get them delivered as the schedule calls for. Fast turnaround comes from planning the haul, not from a van full of mystery materials.
See the difference
Before
After
Before
After
Before
AfterCommon Home Additions & ADU Problems We See in Country Club Homes
- NOA approvals flagged at inspection. Every new roof, window and impact glazing on a Country Club addition needs a documented Miami-Dade product approval. Skipping it on a like-for-like plan gets caught by the inspector, not smoothed over.
- Soft framing behind cracked stucco. On 1960s-’80s block homes, that hairline crack is often the edge of water intrusion and rotten framing. Demo finds it, and it turns a fixed scope into an unbudgeted change order unless it’s scoped from the start.
- Site prep blowing the allowances. A detached ADU or garage conversion scoped without resolving on-lot grading, drainage and septic or utility tie-ins against the existing platted lot will come back to bite on the allowance line.
- Flat-roof moisture traps. Country Club’s older villa clusters have original flat roofs and poorly flashed walls. Before any addition connects to them, that moisture has to be addressed.
Pricing for Home Additions & ADU in Country Club, FL
Here’s what a Country Club addition or ADU actually runs, in ranges, not vague “it depends.” A typical room addition in Country Club runs $45,000 – $130,000. ADU construction runs $90,000 – $220,000. A garage conversion runs $30,000 – $80,000. What pushes a job toward the top: new detached ADU site prep, grading and utility tie-ins against the existing platted lot, hidden stucco water intrusion that has to be opened and dried, and NOA-approved impact glazing and roof tie-downs required under the post-Andrew code. Every number starts as a free, written, line-item estimate, and every scope or price change reaches you as a written change order before work happens.
| Line Item | Country Club Range |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
We Also Serve Cities Near Country Club
Country Club sits right in the middle of a corridor we work regularly, including Miami Lakes, Opa-locka, Hialeah Gardens and Miami Gardens. If your project is in Country Club or just over the line, we’ll come look at the lot and tell you straight what it needs. Learn more about our Home Additions & ADU in Country Club work and how we scope county-permitted lots like yours.
Serving Country Club, FL – Our Local Coverage Area
We serve Country Club and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Home Additions & ADU in Country Club
You permit through Miami-Dade County’s building department, not a municipal one, because Country Club is an unincorporated community. Every eligible job we take here gets the county permits pulled and the inspections signed before we call it done. Call (844) 797-8316 for an exact quote on your project.
Because cosmetic cracks on 1960s-’80s concrete-block and stucco homes are often poorly flashed stucco trapping summer rain, with soft framing behind it. That has to be opened, dried and reframed before rough-in, and a generic plan doesn’t show it. We scope it upfront so the change order doesn’t surprise you later. Call (844) 797-8316 for a free, line-item estimate.
It starts with the site, not the building. Grading, drainage, and septic or utility tie-ins all have to be resolved against your platted, impervious-coverage-limited lot before a footing is poured. We document all of it in the written scope of work. Estimates are free, so call (844) 797-8316 to get one scheduled.
Yes, and it’s often the most practical path to a rentable unit in Country Club. A garage conversion runs $30,000 – $80,000 here, and the range mostly depends on whether the existing slab, tie-ins and drainage need reworking. Call (844) 797-8316 for an exact quote before you commit to a plan.
We put the scope, the allowances and every subsequent price change in writing before work touches the job. The county permit and inspection schedule is folded into the quote too, so NOA product approvals and site grading don’t show up as surprise line items. Call (844) 797-8316 to schedule your free estimate.
Written by the team at Barrett & Sons Construction Miami Gardens.