Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Miami Gardens
If you own a home in Miami Gardens and you’re planning an addition or an accessory dwelling unit, you’re dealing with something most South Florida builders gloss over: this isn’t a design question first. It’s a masonry and load-path question. We work on these 1960s and 1970s CBS block homes all over Miami Gardens, and the hardest part of any addition here is tying new construction into old block so the whole structure handles hurricane wind loads. Call (844) 797-8316 and we’ll walk your property, look at how your house was framed, and give you a written estimate with every allowance spelled out before a single nail moves.
Why Barrett & Sons Construction Miami Gardens Is Miami Gardens’s Preferred Home Additions & ADU Company
We’ve built a reputation in Miami Gardens the slow way, one job at a time, because we do the things the last contractor who showed up at your door probably skipped. Permits pulled. Inspections signed. Every scope and every allowance written down. Our crew members have up to 28 years of experience, and they carry the Barrett & Sons name into every Miami Gardens driveway.
Homeowners in Miami Gardens call us after a national outfit quoted one number on the phone and handed them a different bill at the door. We don’t do that. When something in the scope changes, you get a written change order before the work happens, because an allowance that isn’t on paper is a surprise waiting for a date. We answer the phone with a live person, not a voicemail box. And every eligible job gets a permit pulled and an inspection signed, since this city runs its own building department with standards that differ from Miami-Dade County’s in places, and knowing which rules apply keeps your job moving instead of sitting in a review queue.
Look up the license number yourself before you sign anything, or ask a neighbor in Norland or Carol City who did their roof or their windows. A name you can verify and a face you’ll see again at the hardware store counts for more here than a glossy sales pitch.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Home Additions & ADU Services in Miami Gardens
Our Home Additions & ADU team handles the full range of this work across Miami Gardens, from a small in-law suite to a full detached structure in the backyard. Here’s what each piece usually looks like.
ADU Design & Permitting
Design comes after we understand how your existing house is built, not before. In Miami Gardens, that means looking at your block walls, your roof-to-wall connections, and your flood and wind-zone requirements before we draw anything. We pull the permits through the city’s building department and get the inspections signed, so your ADU is legal, insurable, and ready to stand up to a named storm.

Garage Conversion ADU
A garage conversion is the fastest route to a rentable unit in most Miami Gardens homes, and it typically runs $35,400 – $94,400. The work is less about the walls and more about what happens underneath them: rough-in plumbing and electrical have to be opened up and inspected correctly, and that’s where skipping the permit catches up with you. We do it right the first time so sign-off isn’t a surprise.

New Detached ADU
A detached ADU in your Miami Gardens backyard runs $106,200 – $259,600, and the biggest single cost driver is how the new structure ties to the ground and to your site’s utilities. These are their own builds, so we engineer the wind-load path from scratch and use hot-dip or stainless hardware rated for the salt air. That’s the version that lasts a decade or three, not the cheapest one on the bid list.

Junior ADU & Interior Conversion
An interior conversion or junior ADU carves a small unit out of existing square footage, often a den or a converted section of garage. It’s the least expensive way to add a livable unit, but you’ll need to deal with original single-pane aluminum windows and old flat-roof membranes so the new space stays dry and passes inspection. We upgrade those to impact glazing and current wind-load spec as part of the job.
Trusted Brands We Service in Miami Gardens
We install materials you can look up rather than mystery brands off a van. For concrete work around a new addition, that often means Oldcastle masonry block, Quikrete and Sakrete mixes, and Cambridge Pavers on the hardscape. On the roofing and window side, we work with GAF and CertainTeed shingles and impact glazing rated for Miami Gardens’s high-velocity hurricane zone. We don’t stock parts locally and we don’t pretend to; materials arrive on schedule and installed correctly the first time, backed by the written 90-Day Done Right Promise.
See the difference
Before
After
Before
After
Before
AfterCommon Home Additions & ADU Problems We See in Miami Gardens Homes
- New framing tied into old block with no continuous load path. A stick-frame addition joined to existing CBS walls without the right reinforcement leaves the whole assembly unable to take design wind loads, because the load path stops where old structure begins.
- Cheap inland-spec windows and fasteners failing early. Standard hardware and single-pane windows pit and fail within a few years in the salt air, so homeowners pay twice: once for the cheap install, again for the premature replacement.
- Moisture trapped in porous CBS walls. Unsealed stucco or flat-roof membranes let moisture sit against the block and cause mold inside the new space, which is why moisture management matters as much as wind mitigation in this climate.
- Skipped permits on a garage conversion or ADU. Rough-in electrical and plumbing have to be torn open at inspection sign-off, and what looked like a cheap job turns into a much bigger one.
Pricing for Home Additions & ADU in Miami Gardens, FL
What an addition or ADU costs in Miami Gardens runs $53,100 – $153,400 for a room or home addition, $106,200 – $259,600 for a detached ADU, and $35,400 – $94,400 for a garage conversion. The spread between the low and high end comes down to square footage, how much retrofit work your existing CBS home needs, and whether we’re using coastal-spec hardware and impact glazing (which is what we recommend here) or the cheaper inland version.
Here’s the line-item breakdown:
| Project type | Typical Miami Gardens range |
|---|---|
| Home Addition | $53,100 – $153,400 |
| ADU Construction | $106,200 – $259,600 |
| Garage Conversion | $35,400 – $94,400 |
Every estimate is free, written, and line-item. Scope and allowances go on paper before work starts. Call (844) 797-8316 to schedule a walk-through.
We Also Serve Cities Near Miami Gardens
We take on additions and ADU work across Miami Gardens and into the surrounding communities like Opa-locka, Country Club, Miami Lakes, and Hialeah. If you’re just outside the city line, we can still take a look. You can read more about our work and where we serve at Home Additions & ADU in Miami Gardens.
Serving Miami Gardens, FL – Our Local Coverage Area
We serve Miami Gardens and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Home Additions & ADU in Miami Gardens
Yes. Miami Gardens has its own building department, and its standards run stricter than the county’s in places, especially on wind-load and post-Andrew code enforcement. That means your addition or ADU is permitted directly through the city, not just the county, and getting that right the first time is part of the job. Call (844) 797-8316 for a free estimate that accounts for it.
Because salt air and hurricane wind loads break cheap materials fast. The coastal spec uses stainless and hot-dip hardware, marine-grade finishes, sealed joints, and impact glazing instead of standard fasteners and single-pane windows, and that adds to the upfront cost. It costs less over a decade because you’re not replacing pitted hardware and failing windows within a few years. Call (844) 797-8316 to compare the two on your property.
In most cases, yes. A garage conversion usually runs $35,400 – $94,400, and the main issue is getting the rough-in electrical and plumbing opened up and inspected correctly so sign-off isn’t a surprise. The block walls are often in solid shape and just need new framing and finishes inside. Call (844) 797-8316 for a free walk-through and an exact number.
With proper flashing, a continuous vapor path, sealed stucco transitions, and flat-roof membranes rated for the porous block underneath. Porous CBS holds moisture if it’s not detailed right, and that’s how mold gets into a new space within a couple of seasons. We manage it as part of the tie-in work, not as an afterthought. Call (844) 797-8316 to see how it applies to your home.
Yes, because without a continuous load path the addition can’t take design wind loads, and the assembly fails where old structure meets new. We install straps, clips, or a strap-and-clip retrofit along the tie-in line before the new roof framing connects, so the whole structure holds together in a storm. It’s also what many insurers want to see for wind-mitigation credits. Call (844) 797-8316 for a free look at whether your house needs the retrofit.
Ready to price your Miami Gardens addition or ADU? Call (844) 797-8316 for a free estimate with a written, line-item scope and no surprise invoices. Every eligible job gets its permits pulled and inspections signed, every price change arrives as a written change order, and the whole thing is backed by the written 90-Day Done Right Promise, one call and we come back and make it right.
Written by the team at Barrett & Sons Construction Miami Gardens.